The biggest construction loan mistake is signing a building contract before checking how your lender will pay the builder.
At Dubbo Mortgage Brokers, we know how building finance works for families across Dubbo and the Central West. A little preparation before you sign can save weeks of delay once the build starts.
How Does a Construction Loan Work in NSW?
A construction loan releases money to your builder in stages as work is completed, rather than as one lump sum at settlement. Each stage is usually paid after the lender is satisfied the work is done, which can involve an inspection.
That staged release changes how you repay the loan. NSW Government guidance says a borrower financing a project home must start mortgage repayments once the first progress payment is made and they begin drawing down. Many lenders charge interest only on the amount drawn so far, but the exact terms, fees and inspection rules differ between lenders. Our construction loans page explains the options we can compare for you.
Mistake One: Leaving Your Borrowing Check Until After the Contract
You should know your borrowing capacity before you sign a building contract, because the loan has to cover land, build costs and any extras. Lenders also test whether you could still afford repayments if rates rose by 3 percentage points above the loan rate.
Start with our borrowing capacity calculator to get a feel for the numbers. Then talk to us before you fall in love with a design. A plan that looks affordable on paper can fall short once the lender applies its own assessment, and changing a design is much easier than changing a signed contract.
Mistake Two: Not Matching the Contract to the Loan
Your building contract's payment schedule needs to line up with what your lender will fund. In NSW, a job over $20,000 needs a contract with a progress payment schedule, and payments must match the work actually carried out. The maximum deposit under the Home Building Act is 10 per cent.
Before you sign, check that the stages in the contract suit your lender's drawdown process. If a builder asks for a deposit or payment before the Home Building Compensation Scheme cover certificate is provided, that is a red flag, because NSW rules say a contractor cannot ask for either until cover is in place for contracts over $20,000.
As an example, consider a couple in Dubbo who sign a fixed price contract with a builder and then discover their lender wants an inspection before each stage is paid. The builder expects payment within days of finishing the frame. The couple ask us to review the schedule before the first claim. We check the lender's process, ask the builder to send invoices with supporting documents, and book the inspection early. The frame payment is released without the builder waiting, and the build stays on schedule. The lesson is to ask your lender how long a stage payment takes before the builder asks you.
Ready to get started?
Book a chat with a Mortgage Broker at Dubbo Mortgage Brokers today.
Do You Need Council Approval Before You Apply?
Most lenders want to see your plans, your builder details and the necessary approvals before they commit to funding, so it pays to line these up early. Depending on the project, that can mean a development application and council approval.
Supply the final council plans and a signed contract that matches them. If the plans change after the lender has valued the project, the loan amount may need to be reassessed. Your builder should be a registered builder with the right licence and insurance, and your lender will usually want proof of this. We can tell you what a particular lender asks for before you lodge your construction loan application, so you are not chasing documents halfway through.
Why Does the Interest Rate Matter Less Than the Drawdown Terms?
The rate matters, but drawdown terms, fees and inspection rules can change what the loan costs you and how smoothly the build runs. Rates depend on your deposit size, your lender and the loan type, so compare the whole package rather than one number.
Some lenders charge a progress payment fee, and processing times vary between lenders. The trade-off with interest-only repayments during the build is that you are not reducing the principal while you wait, and repayments rise once principal and interest starts. We can compare lenders on our panel and talk you through how they handle drawdowns, not just the headline rate.
Can You Plan for Costs Beyond the Build Itself?
Yes, and you should, because extras, variations and living costs can add up during construction. If you are renting while you build, you may be covering rent and loan repayments at the same time.
Build a buffer into your plan for changes to the design, upgrades and delays. Variations to the contract usually need to be agreed in writing, and lenders may need to approve any increase in cost. As an example, consider a family building on a block in the Central West. They add a larger shed and a driveway upgrade partway through. We help them request a variation from the lender before the extra work begins. The lender reassesses the loan amount, and the extra funds are available when the builder reaches that stage. Without that step, the family would have been paying for the extras out of savings at short notice.
Are You Eligible for a Grant or Deposit Scheme When Building?
You might be. In NSW, the First Home Owner Grant is $10,000 for eligible new homes, and for vacant land with a building contract the combined value of land, contract and variations must not exceed $750,000. Applications tied to the first drawdown are lodged through the approved agent providing the finance, so tell us early if you plan to apply.
The Australian Government's 5% Deposit Scheme can also support house and land packages, and vacant land with a separate build contract, if you meet the eligibility rules and the price caps. Rules and places can change, so check the details with us before you rely on them. Our pages on first home buyers and the First Home Guarantee go through the options.
If you are building as an investment, tax treatment is different for land holding costs and construction. Speak to your accountant before you decide how to structure your loans.
Ready to Build in Dubbo or the Central West?
We are proud to help local families build in the region we call home, and we won't charge you for our help. Call one of our team or book an appointment at a time that works for you, and we will work through your plans, contract and lender options before you sign.
Frequently Asked Questions
How does a construction loan pay the builder?
A construction loan releases funds in stages as work is completed, rather than all at once. Lenders set their own rules on inspections, fees and the number of drawdowns, so check these before you sign a contract.
What is the maximum deposit on a NSW building contract?
Under the Home Building Act, the maximum deposit is 10 per cent. Work over $20,000 also needs a contract with a progress payment schedule, and payments must match the work actually carried out.
Do I pay interest on the full loan during construction?
Many lenders charge interest only on the amount drawn so far, but terms vary. NSW guidance says repayments start once the first progress payment is made and you begin drawing down.
Should I speak to a broker before signing a building contract?
Yes, because the contract's payment schedule and your lender's drawdown process need to work together. We can check this for you and compare lenders on our panel, without charging you a fee.